Restoration

Aramaicos

Aramaicos oversees the sector of the conservative restoration of valuable buildings, monumental complexes and architectural, artistic and archaeological heritage. An area set to undergo major development mainly through public-sector commissions by the Superintendence for Environmental and Architectural Heritage, the Superintendence for Archaeology and local authorities, among others.

Its major historical restorations include important interventions at the Baths of Caracalla (1996-1997), the Colosseum (2010-2011), the Trevi Fountain (1988-1991), the Palatine – Farnese Gardens (2005-2007), the House of Augustus Complex (2006-2007), Domus Tiberiana (2009-2010) and Porta Maggiore Basilica (2010/2011).

Through project financing, Aramaicos is involved in the conservative restoration of the facades of the ‘A. Cadlolo’ school on behalf of the Municipality of Rome I and in 2021 it improved the safety of the monumental entrance of Palazzo Tiberi at 95 Via IV Novembre in the Monti district of Rome, currently home to ‘Ennio Quirino Visconti’ middle school.

2009-2010
Palatine Hill - Domus Tiberiana - Side of the Roman Forum

Urgent works for consolidation and restoration to safeguard and secure the structures of the Domus Tiberiana, covering of the Clivus Victoriae near the Belvedere terrace

Works Supervisor: Arch. M. Grazia Filetici
Archaeological Director: Dr. Maria Antonietta Tomei
Works performed: Archaeological stratum and level excavation; waterproofing of wall structures at the level of the upper terrace; removal of debris and securing of the vaults of the Clivus Victoriae; removal of debris, biocide treatment, wall pre-consolidation with injections of special mortars, consolidation of structural cracks, with the use of stainless steel tie rods, on the wall sections of the north-west side of the Domus Tiberiana; consolidation and partial reconstruction of vaults.

2009-2010
Palatine Hill - Domus Tiberiana - Side of the Roman Forum

Urgent works for securing and shoring up the rooms on the levels I and II of the Clivus Victoriae
Presidency of the Council of Ministers – Commissioner Delegate for urgent interventions in the archaeological areas of Rome and Ostia Antica

Works Supervisor: Arch. M. Grazia Filetici
Archaeological Director: Dr. Maria Antonietta Tomei
Works performed: Preliminary monitoring of the rooms with orthoimage; construction of provisional structures for the shoring of vaults in the rooms on the first level, for the working surface to prepare the dismantling of the masonry slab on the first level, for the construction of the temporary roofing of the entire complex; dismantling and disposal of the masonry slab from the 1960s.

2010
Underground Basilica of Porta Maggiore

Conservative works extended to the mosaic floor which is particularly damaged, documentation, prospecting and monitoring

Works Supervisor: Arch. Lucilla Labianca
Archaeological Director: Dr. Ida Sciortino
Works performed: Preliminary documentation by mapping the state of conservation of the entire artefact; checking and restoring the cohesion of the mosaic tesserae, preparatory operation to biocide treatment and cleaning.

1988-1991
Trevi Fountain

Conservative restoration of the monumental complex

Works Supervisor: Arch. Italo Ceccarelli
Scientific Director: Dr. M. Luisa Cardelli
Works performed: Construction of galvanised tubular scaffolding, including installation of maintenance elevator; restoration of stone surfaces, consolidation with titanium elements of the sculptural group on the top, restoration of bronze elements, consolidation and painting of plasterwork, restoration of fixtures, restoration of stucco work, restoration of brickwork, seats and steps in the basin; demolition and reconstruction of the basin waterproofing. Scientific documentation through diffraction, stratigraphic sections, microseismic evaluation with ultrasound and degradation mapping.

2010-2011
Flavian Amphitheatre

Order 1 – Roofed ambulacra – Interventions aimed at safeguarding the monument Presidency of the Council of Ministers – Commissioner Delegate for urgent interventions in the archaeological areas of Rome and Ostia Antica

Works Supervisor: Arch. Piero Meogrossi
Archaeological Director: Dr. Rossella Rea
Works performed: Supply and installation of iron works: gates, railings, bollards, footbridges, signposts and containers in compliance with waste management regulations; all according to the original design of the Works Supervisor.

2009-2010
Palatine Hill - Domus Tiberiana - Side of the Roman Forum

Urgent works for consolidation and restoration to safeguard and secure the structures of the Domus Tiberiana, covering of the Clivus Victoriae near the Belvedere terrace

Works Supervisor: Arch. M. Grazia Filetici
Archaeological Director: Dr. Maria Antonietta Tomei
Works performed: Archaeological stratum and level excavation; waterproofing of wall structures at the level of the upper terrace; removal of debris and securing of the vaults of the Clivus Victoriae; removal of debris, biocide treatment, wall pre-consolidation with injections of special mortars, consolidation of structural cracks, with the use of stainless steel tie rods, on the wall sections of the north-west side of the Domus Tiberiana; consolidation and partial reconstruction of vaults.

Close
2009-2010
Palatine Hill - Domus Tiberiana - Side of the Roman Forum

Urgent works for securing and shoring up the rooms on the levels I and II of the Clivus Victoriae
Presidency of the Council of Ministers – Commissioner Delegate for urgent interventions in the archaeological areas of Rome and Ostia Antica

Works Supervisor: Arch. M. Grazia Filetici
Archaeological Director: Dr. Maria Antonietta Tomei
Works performed: Preliminary monitoring of the rooms with orthoimage; construction of provisional structures for the shoring of vaults in the rooms on the first level, for the working surface to prepare the dismantling of the masonry slab on the first level, for the construction of the temporary roofing of the entire complex; dismantling and disposal of the masonry slab from the 1960s.

Close
2010
Underground Basilica of Porta Maggiore

Conservative works extended to the mosaic floor which is particularly damaged, documentation, prospecting and monitoring

Works Supervisor: Arch. Lucilla Labianca
Archaeological Director: Dr. Ida Sciortino
Works performed: Preliminary documentation by mapping the state of conservation of the entire artefact; checking and restoring the cohesion of the mosaic tesserae, preparatory operation to biocide treatment and cleaning.

Close
1988-1991
Trevi Fountain

Conservative restoration of the monumental complex

Works Supervisor: Arch. Italo Ceccarelli
Scientific Director: Dr. M. Luisa Cardelli
Works performed: Construction of galvanised tubular scaffolding, including installation of maintenance elevator; restoration of stone surfaces, consolidation with titanium elements of the sculptural group on the top, restoration of bronze elements, consolidation and painting of plasterwork, restoration of fixtures, restoration of stucco work, restoration of brickwork, seats and steps in the basin; demolition and reconstruction of the basin waterproofing. Scientific documentation through diffraction, stratigraphic sections, microseismic evaluation with ultrasound and degradation mapping.

Close
2010-2011
Flavian Amphitheatre

Order 1 – Roofed ambulacra – Interventions aimed at safeguarding the monument Presidency of the Council of Ministers – Commissioner Delegate for urgent interventions in the archaeological areas of Rome and Ostia Antica

Works Supervisor: Arch. Piero Meogrossi
Archaeological Director: Dr. Rossella Rea
Works performed: Supply and installation of iron works: gates, railings, bollards, footbridges, signposts and containers in compliance with waste management regulations; all according to the original design of the Works Supervisor.